Temporary Works

Temporary Propping

Temporary propping systems are commonly used for tilt slabs during civil construction, although their applications are infinite. BVT offers services to certify the propping to the required working loads to the structural design standards AS/NZS1170 and NZS 3404 to comply to all the necessary loading criteria such as wind loading and seismic.

Contact Us
 team member
Max Waters

BE (Hons), NAFEMS, CMEngNZ, CPEng
Senior Team Leader

m +64 22 100 1038
e max.waters@bvt.co.nz