Article

Concrete Pumping Health and Safety Guidelines

BVT would like to increase awareness of the requirements of these guidelines. Issued last February, the guideline provides practical guidance about the health and safety issues of concrete pumping – refer to our downloads section for a copy.

Section 7.2 requires annual inspections to be carried out by a competent person such as a chartered professional engineer. Inspectors are believed to be reinforcing this from early next year.

BVT have the capability to do these inspections and we encourage you (or someone you know) who requires an inspection done to contact us.